Kadi has taken big leap in Maintenance field by securing maintenance of 4 major airports from Presidency of Civil Aviation. The growth rate both in Quantity and Quality is appreciable as can be seen from the profile of some of the Projects completed already and described briefly hereunder:
HAIL ELECTRIFICATION PROJECT
This contract worth 253 Millions Saudi Riyals was awarded to Kadi by the Electricity Corporation after a tough competition in tendering with national and some locally sponsored international companies.
This prestigious project comprised of Supply, Erection and commissioning of 330KMS of O/H 33KV Tower Lines, 600KMS of O/H 13.8KV Pole Lines, 13 Nos., 33KV/13.8KV Substations, a very large number of 13.8KV/220V Pole Mounted/Distribution and Package substations. The work has been completed in full and to the entire satisfaction of the Client, without any left over liability whatsoever.
This contract worth approximately 75 Millions Saudi Riyals was awarded to Kadi as a Sub-Contractor, for all Mechanical & Electrical Works, in a huge complex coming up for MODA (Ministry of Defence & Civil Aviation) in Khamis Mushayt.
This was another Power House Project executed by Kadi, on Turnkey basis, this time, in Hotat Sudair about 200 kms from Riyadh.
The Project was done in two stages. In the 1st stage, three sets of 2500KW capacity were installed, and subsequently, on the Client's request, two more sets of 1500KV capacity each, were installed, taking the total commissioned capacity to 10,500KW. The cost of complete project was 24 Millions Saudi Riyals.
Durma Project is yet another in the line of Power House and Network turn-key projects. Besides the 13.8KV network it involved the building the entire power house of 6000KW capacity. The entire project valued at about 20 Millions Saudi Riyals.
Kadi has been in the forefront of Supplying, Erection and Commissioning, Mobile Generating Sets, at short notice, all over the Kingdom. Notable among these are the four, 1500KV capacity each, Gen. Sets Kadi supplied, for Central Al-Qaseem Project, to the Electricity Corporation, at a contract value of about 6.5 Millions Saudi Riyals.
Kadi received a letter of intent form M/s Hyundai, for executing the complete supply and installation work of 14 Standby Gen. Sets, Street Lights, Security Lights etc. in the "KING FAHAD SECURITY COLLEGE (KIFAS) PROJECT" of the Ministry of Interior at a cost of SR 35 Millions. The period of execution was one year to be completed by end March 1987. Kadi was ahead of schedule in this job and thus, stands completed.
Another project in a series of subcontract with major civil const. co., is the Tabho Project, short for, "Housing for noncommissioned officers in Tabuk Airport" for the Ministry of Defense & Civil Aviation (MODA). We completed erection of Elect. works to the main contractor M/s. MEEDCO (Middle East & Development Co.) for all the Electrical works which include 33KV, Sub-Stations. 33KV underground cabling (including ducts), standby Gen. Sets and entire high voltage power equipment.
Kadi completed a SR 30 Millions project for the Electricity Corporation, Riyadh, for construction of a 72 Kms. 132KV, Transmission line and extension of 132KV Substation at Al-Bir (Tabuk Area). The project has been completed in schedule time.
Kadi completed for SCEC0-C, a project of SR 38 Millions, for construction of 132KV OHL, 132 Kv Cabling Fiber Optic network and its termination equipment in S/S 8704.
A double circuit 58 kms. of 33 Kv O.H.Line was constructed between S/S 8704 in Howtah and S/S 7751 in Hariq through a tough terrain.
This contract worth SR 136 Millions was awarded in 1409H to Kadi in joint venture with M/s. Al-Namla. The nature of job is for the purposes of Operating & Maintenance Group 5, Domestic Airports Project, for a period of 3 years, which is already completed successfully & to the entire satisfaction of the client.
This contract worth 67 Millions Saudi Riyals was awarded to Kadi by SCECO-C for construction of 133Kms of 132kV Double circuit line between Howtah-Aramco-Layla, 132kV Cable works, 200 Kms of OPGW, 33kV underground and OH lines etc. The project was for the supply of power supply for Aramco Howtah Oil Fields.
Kadi completed the project in time to the entire satisfaction of the client.
Kadi completed for Riyadh Water & Sewerage Department, a project of SR 52 Millions, for construction of 33kV S/S at Salbukh and Buwayb, 90 Kms of 33kV Double circuit line, 33kV under ground works, installation of SCADA in the two sub-stations.
This project worth 27 Millions Saudi Riyals was awarded to Kadi by SCECO-West for Supply and Erection of 2x5 MW D.G. sets and allied equipments, which is already completed successfully & to the entire satisfaction of the client.
Kadi completed a SR 27 Millions turnkey project for the SCECO-West, for Supply and Erection of 2x5 MW D.G. sets and allied equipments.
Kadi completed a SR 34 Millions extension project for SCECO-West for Supply and Erection of 2 x 5 MW D.G Sets and allied Equipments to the entire satisfaction of the client.
Kadi has been awarded turnkey project for the supply, installation, testing and commissioning of the following works for 61 Millions Saudi Riyals.
1. Construction of 132 Kv Sub-station.
2. Construction of 13.8 Kv Switching station.
3. Construction of 132 Kv Overhead Transmission Line.
4. OPGW for 5 sub-stations.
5. OPGW terminal equipments for 5 sub-stations.
6. SCADA equipment etc.
Shifting of one tower on the existing 132kV OHL 8059/8015, Four towers on the existing 132kV OHL 8813/8815 between Qassim and Hail, approx. length of OHL 2000 meters, two towers on existing 132kV OHL 8813/8816 between Qassim and Hail – route length approx. 700 meters and two
towers on existing 8903/8911 in Hail Area – route length approx. 700 meters.
This is 132/13.8 kV Substation with 3 nos. 60MVA Transformers, 10 bays of GIS, 28 nos. under ground Out-going Feeders. Project value Approx. 45 million.
132/13.8kV Substation with 3 nos. 60MVA Transformers, 10 bays of GIS, Capacitor Bank and Out-going feeder for power supply to ARAMCO. Project Value approx. SR. 41 million.
132kV SEC Switching station with 10 GIS bays. Project value SR. 34 million.
This project is valued for SR. 27 million and is completed in time. Expecting Final Acceptance Certificate.
This project is of 21 Kms. Double Circuit Overhead Line for 132/33/13.8 kV Substation. Project value SR. 20 million.
Contruction of Double Circuit Overhead Transmission line for 20 Kms. and Reconductoring for 23 Kms. Project Value SR. 35 million.
Construction of 132/13.8 kV Substation with 2 nos. 60MVA Power Transformers, 10 bays of GIS, Capacitor Bank and 28 Out going Feeder. Project value Approx. 59 million.
|